The Ultimate Guide to Bathroom Installations in Bristol
What to Expect and How to Prepare
So, you’ve decided it’s time for a new bathroom - great choice! A fresh, well-designed bathroom doesn’t just look amazing, it makes daily life easier, adds value to your home, and gives you a space you actually enjoy spending time in.
But where do you start? If you’ve never had a bathroom installed before, the process can seem overwhelming. How long does it take? What should you do to prepare? And how do you make sure everything runs smoothly?
At Qube Bathrooms, I’ve been fitting bathrooms in Bristol for over 20 years. I know exactly what to expect, how to keep things on track, and most importantly, how to take the stress off your shoulders. This guide will walk you through the whole process, from planning and choosing your fittings to what happens once the work begins.
Step 1: Planning Your Bathroom Installation
A little planning now can save you a lot of hassle later. Before any work starts, take some time to think about what you actually want from your new bathroom.
Key Things to Consider:
Budget: The cost of a bathroom installation can vary massively depending on the size of the space, the quality of fittings, and any structural work needed. As a rough guide, prices range from £3,000 for a simple refresh to £15,000+ for a high-end installation.
Layout: If your current layout works, sticking to it will save money. But if your bathroom feels cramped or awkward, this is your chance to rethink things.
Functionality: Do you need extra storage? A bigger shower? A double sink? It’s worth making a list of must-haves before you start choosing fixtures.
Style & Features: Think about what kind of look you’re going for. Do you want a modern, minimalist feel? Something classic and timeless? Or maybe a luxurious spa-style retreat?
Step 2: Choosing the Right Bathroom Fitters in Bristol
A bathroom is a big investment, so choosing the right fitters is crucial. You want a fitter that’s reliable, skilled, and knows what they’re doing.
What to Look for in a Bathroom Fitter:
Experience: Have they worked on bathrooms like yours before? Check out their previous work.
Reputation: Look at reviews and testimonials to see what other customers have said.
Clear Quotes: A good fitter should give you a detailed quote upfront, with no hidden extras.
Step 3: What to Expect During the Installation Process
Every bathroom installation is slightly different, but here’s a general breakdown of how it all happens.
1. Removing the Old Bathroom (1-2 days)
This is the messy part. Stripping out your old fixtures, tiles, and flooring, carefully disconnecting plumbing and electrics as needed. If I find any hidden issues - like leaks or dodgy pipework - I’ll flag them early so they can be sorted before the new bathroom goes in.
2. Plumbing & Electrical Work (2-5 days)
If you’re keeping your existing layout, this stage is usually straightforward. If you’re moving things around, I’ll rework the pipework to suit your new design. This is also when things like underfloor heating or new extractor fans get installed.
3. Plastering & Waterproofing (1-3 days)
I’ll prepare the walls, lay down waterproofing where needed (especially in shower areas and wet rooms), and make sure everything is ready for tiling.
4. Tiling & Flooring (3-5 days)
Tiles make a huge difference to the look of your bathroom. I’ll fit floor and wall tiles, ensuring everything is sealed properly to prevent leaks.
5. Installing Fixtures & Fittings (2-4 days)
Now it all starts coming together! Your new bath, shower, toilet, and sink will be installed, along with taps, mirrors, storage, and lighting.
6. Final Checks & Finishing Touches (1-2 days)
I’ll go over everything, check all the plumbing is working as they should, and add the final details like sealing and grouting. Once we’re both happy with everything, your brand-new bathroom is ready to use.
At Qube Bathrooms, I pride ourselves on our attention to detail. We don’t just finish a job and walk away - we make sure every last seal is perfect, every tap runs smoothly, and that you’re 100% happy with your new space.
That’s why we offer a 1 year guarantee on all work!
Step 4: How to Prepare for Your Bathroom Installation
A little preparation can make the whole process go much more smoothly. Here’s what we recommend:
Clear the space – Empty bathroom cabinets, take down any mirrors or shelves, and remove anything that might get in the way.
Plan for downtime – If it’s your only bathroom, you might need to arrange alternative facilities while work is ongoing.
Protect other areas – I’ll do my best to keep mess to a minimum, but it’s always a good idea to use dust sheets and keep doors closed where possible.
Think about pets and kids – If you’ve got little ones (or curious pets), it’s worth making sure they stay out of the work zone for safety reasons.
Final Thoughts: A Bathroom Installation Should Be Exciting, Not Stressful
A new bathroom is a big project, but it doesn’t have to be stressful. With the right planning, a good team, and a clear idea of what to expect, the whole process can be smooth, straightforward, and even enjoyable.
At Qube Bathrooms, I’ve been installing bathrooms across Bristol for over 20 years. I know the common pitfalls, I understand how to keep projects on schedule, and I’m here to make sure you end up with a bathroom you absolutely love.
Got a project in mind? Click here for a free quote.